Infrastructure project supply across Georgia · since 2019
Home/Blog/PE gas pipe for medium-pressure rehabilitation: SDR, colour and fittings
GASGAS

PE gas pipe for medium-pressure rehabilitation: SDR, colour and fittings

30 Jul 20264 min readAlso in RU, KA

Workers with a large orange drum on site

Rehabilitating a medium-pressure gas main with polyethylene is routine work, but it is work where the specification has no slack: the pipe carries gas, the jointing is welded on site, and the colour on the pipe is a safety signal, not a finish. Three things carry most of the risk — the SDR, the colour and marking, and the electrofusion fittings — and all three belong in the specification, not left to the crew. Gas work also follows the national gas code; the notes here are general engineering, to be read against that code and confirmed before use.

PE for gas is not PE for water

Start from the right standard. Polyethylene gas pipe is made and tested to EN 1555, the gas series, which is distinct from EN 12201 for water even when the raw material is the same PE100. Specifying the water standard on a gas job is a documentation error that a good inspector will stop, and rightly: the gas series governs the markings, the fittings and the pressure design that keep the main safe. Name EN 1555 explicitly.

SDR and the pressure it allows

SDR — the standard dimension ratio — is the pipe's outside diameter divided by its wall thickness, so a lower SDR is a thicker wall for a given diameter and a higher allowable pressure. SDR 11 is the common choice for medium-pressure PE100 gas mains; thinner-walled ratios such as SDR 17.6 suit lower-pressure duty. The operating pressure a pipe is allowed to carry comes from the SDR, the material and the design factor set by the gas code together, so do not read a maximum pressure off the SDR alone — state the SDR and the required operating pressure, and let the design confirm the pair.

Wall ratio and duty (indicative — confirm against the gas code)
SDRWallTypical duty
SDR 11Thicker wallMedium-pressure PE100 mains
SDR 17 / 17.6Thinner wallLower-pressure distribution

Colour and marking

On a PE gas pipe the colour is a safety code. Gas pipe is yellow, or black with yellow or orange stripes, specifically so no one mistakes it for the blue of a water main when a trench is reopened years later. Never accept blue pipe on a gas job, and specify that the pipe carries its standard printed marking along its length — material, SDR, standard and size — so the pipe identifies itself wherever it is cut into. The marking is how the next crew knows what they have found.

Electrofusion fittings and jointing

Medium-pressure PE gas is jointed by electrofusion: a fitting with an embedded coil is slid over prepared pipe ends and fused by a controlled current. The joint is only as good as the preparation — the oxidised skin scraped off, the surfaces clean and dry, the pipe rounded and clamped — and modern fittings to EN 1555-3 carry a barcode so the welding set logs the parameters and the joint is traceable. For live rehabilitation, under-pressure branch and tapping tees let a new PE main be connected and the old one abandoned without shutting the supply. Specify the fittings to the same EN 1555 series as the pipe, and require traceable fusion records.

Insertion or open-cut

Two methods dominate rehabilitation. Slip-lining — inserting a new PE pipe inside the old steel or cast-iron main — reuses the existing route and avoids a continuous trench, at the cost of some bore; open-cut replacement gives a full-size new main where the ground and the services allow. The method decides the pipe diameter and the fittings as much as the duty does, so fix the method with the designer before the materials are ordered, and plan the service transfers that reconnect every property to the new main.

Find it again: tracing a PE main

Polyethylene does not show on a metal detector, so a PE gas main has to be made findable before it is buried. Lay a detectable tracer wire or marker tape along the pipe and bring the wire up to the surface boxes so a locator can energise it, and record the route accurately. A gas main that cannot be located is a hazard to every future excavation near it; the tracer is cheap insurance against a strike, and on a gas main a strike is not a wet trench — it is an evacuation.

Pressure testing before gas-in

A rehabilitated PE main is strength- and tightness-tested to the gas code before it is commissioned — typically with air or an inert medium, never by letting gas in to find the leaks — and the test is recorded as part of the handover. Specify the test and the records in the BOQ alongside the pipe and fittings: on a gas main the acceptance test is not paperwork, it is the last line between a buried weld and a live network.

What to write in the BOQ

Name the gas standard, the material, the SDR, the size and the colour, and tie the fittings to the pipe: “PE100 gas pipe to EN 1555, SDR 11, DN 125, yellow with printed marking, jointed with EN 1555-3 electrofusion fittings, traceable fusion records.” State the rehabilitation method and the operating pressure so the design can confirm the SDR. Because this is regulated work, confirm every line against the national gas code — and talk to our engineers early, since the method and the fittings decide the order long before the pipe is needed on site.

www.gon.ge

GON supplies drainage, water, gas and road-infrastructure products to contractors, utilities and IFI-funded programmes across Georgia.